Maintenance of Highway Sanitation
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3021 · Asked on 2026-08-06
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the steps taken by the Government to ensure sustained maintenance of highway sanitation beyond campaign periods to prevent relapse into unsanitary conditions; (b) the details of provisions in place for incentivizing or penalizing concessionaires under performance-based contracts for highway cleanliness and upkeep; (c) the percentage of ongoing and completed National Highway projects that have incorporated eco-friendly construction materials and energy-efficient street lighting systems along with the details of such projects; (d) the mechanisms in place for independent verification of compliance and the steps being taken to expand designated green corridors; and (e) whether the Government has initiated or proposed pilot projects employing Internet of Things (IoT), Artificial Intelligence (AI) and other emerging technologies for smart highway operations and enhanced traffic management and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of AMRUT 2.0
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3022 · Asked on 2026-08-06
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
Radheshyam Rathiya, Dhairyasheel Mane, Nishikant Dubey, Mala Rajya Laxmi Shah, Sanjay Jaiswal, Naba Charan Majhi, Ramesh Awasthi, Avimanyu Sethi, Anil Firojiya, Ravi Kishan, Shashank Mani, Rahul Lodhi, Mahesh Kashyap, Dharmapuri Arvind, Anup Dhotre, Smita Wagh, Satish Kumar Gautam, Balabhadra Majhi, Alok Sharma, Pradeep Kumar Singh, Kalanidhi Veeraswamy
(a) whether the Government has reviewed the implementation of Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0 and if so, the details thereof along with the projects sanctioned, completed and under implementation including the corrective measures suggested thereunder, State/UT and city-wise including Nabarangpur Lok Sabha Constituency of Odisha and Jalgaon Lok Sabha Constituency of Maharashtra; (b) the progress made in developing urban water supply, sewerage, septage management infrastructure, storm water drainage, conservation of water bodies and development of green urban spaces under AMRUT 2.0, State/UT and city-wise including above Constituencies; (c) the details of the funds allocated, released and utilised during the last three years and the current year for the said purpose under AMRUT 2.0, State/UT and city-wise including above Constituencies; (d) whether any measures have been taken to improve implementation in comparatively slow-performing States and Urban Local Bodies (ULBs) and if so, the details thereof, State/UT and city-wise including above Constituencies; (e) the outcomes achieved in improving access to urban water supply and sanitation services including the benefits accrued to the residents under AMRUT 2.0, State/UT and city-wise including above Constituencies; (f) whether the Government proposes to sanction additional AMRUT 2.0 projects for strengthening urban water supply and sewerage infrastructure in the country, State/UT and city-wise including above Constituencies; (g) the number of urban households expected to benefit from these projects and the extent of improvement targeted in piped water supply coverage, sewerage connectivity and wastewater treatment capacity; and (h) the timeline fixed and the steps taken by the Government to ensure timely completion of these projects and strengthen sustainable urban water management including recycling and reuse of treated wastewater in Tamil Nadu?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGroundwater Mapping for Vaigai Basin
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3023 · Asked on 2026-08-06
Ministry: JAL SHAKTI
Member asked
We have not ingested the asking members for this question.
(a) whether the Union Government has any proposal to undertake a comprehensive groundwater mapping exercise for the Vaigai basin and its adjoining areas and if so, the details thereof; (b) whether the Union Government has also any integrated water management plan for the Vaigai river basin covering irrigation, drinking water and groundwater recharge; and (c) if so, the details thereof and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceFlight Operations at Shivamogga Airport
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3024 · Asked on 2026-08-06
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government has received any proposal from the State Government of Karnataka for inclusion of the Bengaluru–Shivamogga–Bengaluru (BLR–RQY–BLR) sector under the modified Regional Connectivity Scheme (RCS)-UDAN and if so, the details thereof along with the action taken thereon; (b) whether the Government proposes to accord priority consideration to the restoration of scheduled commercial flight services on the Bengaluru–Shivamogga sector under the said scheme in view of the suspension of services and the growing public demand for improved regional connectivity; and (c) whether the Government proposes to introduce suitable policy measures under the said scheme to prioritise the revival and sustainability of regional air routes that have demonstrated proven passenger demand and significant socio-economic importance and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of Airport in Chhattisgarh
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3025 · Asked on 2026-08-06
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government has received any proposal or demand for the construction of a new civil airport near Durg-Bhilai region in Chhattisgarh in view of the increasing population, industrial activities and growing number of passengers in the region; (b) if so, the details thereof and the action taken thereon so far; (c) whether the Government has decided to conduct any survey or feasibility study for setting up a new airport in Durg-Bhilai region; and (d) if so, the details and the present status thereof along with the proposed timeline fixed in this regard and if not, the reasons therefor?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceGreenfield Airports
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3026 · Asked on 2026-08-06
Ministry: CIVIL AVIATION
Member asked
(a) the number of Greenfield airports currently under development in various States of the country and the expected timeline fixed for commencement of their operations; (b) the details of the measures being taken by the Government to ensure sustainable aviation practices including integration of solar power capacity and sustainable aviation fuel infrastructure at newly developed airports in the country, particularly in Maharashtra and Madhya Pradesh; and (c) the details of the employment opportunities likely to be generated and economic benefits likely to accrue from these airport projects, State-wise, particularly for Maharashtra and Madhya Pradesh?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of MSE-CDP
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3027 · Asked on 2026-08-06
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the details and the total number of proposals received and approved under Micro & Small Enterprises–Cluster Development Programme (MSE-CDP) since its inception, year-wise, State-wise and district-wise for Andhra Pradesh; (b) the funds allocated, released and utilised, since its inception, year-wise and State-wise; (c) the physical status of approved projects and the timeline targeted for completion, State-wise and district-wise for Andhra Pradesh; (d) the measures taken to ensure skilling of women entrepreneurs to form self-employment generating clusters in different sectors such as textiles; and (e) the issues faced in implementation of the scheme and the measures taken to address the same?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePendency on MSME Samadhaan Portal
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3028 · Asked on 2026-08-06
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
(a) the total number of delayed payment applications currently pending on the Micro, Small and Medium Enterprises (MSME) Samadhaan portal nationwide and the cumulative financial amount locked up to the latest quarter of 2026; (b) the structural reasons for the delay in full API integration between MSME Samadhaan Portal and the Government e-Marketplace (GeM) to automatically enforce the statutory 45-day payment mandate under Section 15 of the Micro, Small and Medium Enterprises Development Act, 2006; (c) the total number of pending disputes before the Micro and Small Enterprises Facilitation Council (MSEFC) in Chhattisgarh, specifically concerning SC/ST entrepreneurs, tribal cooperatives and micro-units in industrial corridors; and (d) the timeline for rolling out the Online Dispute Resolution (MSE-ODR) framework under the Raising and Accelerating MSME Performance (RAMP) scheme and introducing automated penalty mechanisms for defaulting buyer departments?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUsage of Drones
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3029 · Asked on 2026-08-06
Ministry: CIVIL AVIATION
Member asked
(a) the manner in which the reduction of Goods and Services Tax (GST) on drones to five per cent last year has impacted the adoption of drone-as-a-service models in the agricultural and logistics sectors; (b) whether the Government is on track to notify the National Sustainable Aviation Fuel (SAF) Policy to meet the one per cent blending target mandate starting in 2027 and if so, the details thereof; (c) the progress made in the Namo Drone Didi initiative; and (d) the number of women Self-Help Groups trained successfully as drone pilots till February, 2026?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceIntegrated Water Governance and Sustainable Water Resource Management
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3030 · Asked on 2026-08-06
Ministry: JAL SHAKTI
Member asked
We have not ingested the asking members for this question.
(a) whether the Government has examined the need for a holistic approach to water governance by treating rivers, aquifers, wetlands and other water resources as interconnected ecological systems requiring coordinated management instead of fragmented administrative oversight and if so, the details thereof; (b) the major institutional, legal, infrastructural and inter-State challenges that impede equitable utilisation of water resources and balanced distribution among agriculture, domestic consumption, industry and environmental requirements; (c) the reforms proposed to strengthen basin-oriented planning, integrated data-sharing, scientific hydrological assessment, real-time monitoring and evidence-based water resources management; (d) the collaborative arrangements envisaged to enhance coordination among State Governments, local bodies, research institutions, water user associations and civil society organisations for participatory decision-making; and (e) the long-term strategy of the Government to promote inclusive, sustainable and climate-resilient water governance based on the principle of equitable access to water for every citizen?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceProgress made under NAQUIM 2.0
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3031 · Asked on 2026-08-06
Ministry: JAL SHAKTI
Member asked
We have not ingested the asking members for this question.
(a) the progress made in preparation of high-resolution aquifer mapping and area-specific groundwater management plans for Dahod Lok Sabha Constituency under the National Aquifer Mapping and Management Programme (NAQUIM 2.0); (b) whether any scientific datasets or resource maps prepared under NAQUIM 2.0 have been shared with the local administration and block-level authorities of Dahod Lok Sabha Constituency to address regional water scarcity and if so, the details thereof; and (c) whether the Government proposes to deploy any innovative water management solutions or technology consortia under the ANRF–Jal Shakti MAHA Water Mission to address drinking water and irrigation challenges in the water-stressed areas of the said Constituency and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceImplementation of MAHA Water Mission
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3032 · Asked on 2026-08-06
Ministry: JAL SHAKTI
Member asked
Bhartruhari Mahtab, Nishikant Dubey, Hemant Savara, Sanjay Jaiswal, Naba Charan Majhi, Pradeep Kumar Singh, Anil Firojiya, Rajkumar Chahar, Mahesh Kashyap, Khagen Murmu, Brijesh Chowta, Manoj Tiwari
(a) whether the Government has initiated implementation of the ANRF–Ministry of Jal Shakti MAHA Water Mission and if so, the details thereof; (b) the institutional framework established for selection, monitoring and evaluation of research projects and technology consortia under the said Mission including the mechanism for considering proposals from Dakshina Kannada; (c) the measures undertaken/being undertaken to facilitate participation of Start-ups, Micro, Small and Medium Enterprises (MSMEs), academic institutions such as Indian Institutes of Technology (IITs), National Institutes of Technology (NITs) etc., and other research organisations in developing innovative water management solutions; and (d) the manner in which technologies developed under the said Mission are proposed to be validated, deployed and integrated into water resources management and drinking water programmes like Jal Jeevan Mission (JJM) across the country?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceUninterrupted Power Supply in Robertsganj
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3033 · Asked on 2026-08-06
Ministry: POWER
Member asked
We have not ingested the asking members for this question.
(a) whether electricity supply is not fully functional in several rural areas of Robertsganj Parliamentary Constituency including Sonbhadra district of Uttar Pradesh, if so, the details thereof; and (b) the time by which complete and uninterrupted power supply is likely to be made available across Robertsganj Parliamentary Constituency?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of Tunnels on NH-326 and NH-26
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3034 · Asked on 2026-08-06
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the present status of the proposals for construction of tunnels at Gumma Ghat on National Highway (NH)-326 and Jeypore Ghat on NH-26, including the status of surveys, DPRs and approvals; (b) whether the Government has assessed their impact on road safety, reduction in travel time and all-weather connectivity in the tribal districts of Koraput and Rayagada, if so, the details thereof; (c) the present status of the Koraput, Jeypore and Rayagada Bypass projects, including land acquisition, approvals, tendering and construction; (d) the reasons for delay, if any, in implementation of these projects; and (e) the timeline for sanction, commencement and completion of the tunnel and bypass projects to improve connectivity, reduce accidents and facilitate socio-economic development in the region?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourcePedestrian Infrastructure
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3035 · Asked on 2026-08-06
Ministry: HOUSING AND URBAN AFFAIRS
Member asked
We have not ingested the asking members for this question.
(a) whether the Government is aware of the concerns relating to inadequate pedestrian infrastructure, unsafe footpaths, traffic congestion and rising dependence on private vehicles affecting urban mobility and equitable access across cities in the country and if so, the details thereof; (b) the steps taken by the Government to promote walkable cities through pedestrian-friendly roads, cycling infrastructure, integrated public transport systems and improved last-mile connectivity under urban development programmes; (c) the progress made by the Government in expanding non-motorised transport facilities, accessible footpaths, street safety measures and inclusive mobility infrastructure for women, elderly citizens and differently able persons in urban areas; and (d) whether the Government has assessed the implications of continued prioritisation of motor vehicle infrastructure over pedestrian and public transport systems in densely populated cities and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceNitrate Levels in Groundwater
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3036 · Asked on 2026-08-06
Ministry: JAL SHAKTI
Member asked
(a) the data on nitrate levels in groundwater during the last five years, district-wise; (b) the initiatives taken/being taken by the Government to reduce nitrate contamination in groundwater caused due to excessive use of fertilizers in agriculture and the impact thereof; (c) the progress made in expansion of groundwater monitoring network, the use of digital tools and the proposal to expand the network to 40,000 wells by 2027 along with the expected outcomes thereof; (d) the strategy of the Government to maintain a balance between groundwater extraction and recharge in over-exploited areas for sustainable use of groundwater; and (e) whether the Government has conducted any study on the environmental and health impacts of chemical contamination in groundwater and if so, the details and the findings thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceDevelopment of Hisar Airport
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3037 · Asked on 2026-08-06
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government is aware that despite the announcement to develop Hisar Airport as an international-standard airport, serious concerns have recently been raised regarding the non-availability of a suitable runway for safe landing and the quality of the runway during a recent chartered aircraft accident and if so, the details thereof; (b) whether the Government has conducted any technical and safety audit of the runway, taxiway and other aviation infrastructure at Hisar Airport and if so, the details and the major findings thereof; (c) whether the Government has received any complaints regarding the premature development of potholes and other structural deficiencies on the runway and if so, the details thereof; (d) whether the same has been investigated and if so, the details and the findings thereof along with the action taken against the agencies found responsible; and (e) the time-bound action plan formulated by the Government to develop Hisar Airport as a safe and fully operational airport conforming to international standards?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceConstruction of Railway Over Bridge
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3038 · Asked on 2026-08-06
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the date of approval and commencement of construction work for the Vapi (Chala) to Daman and Mohangam-Navwali to Daman Railway Over Bridge (ROB) projects in Gujarat along with their original sanctioned cost, appointed construction agency and scheduled completion date; (b) the current physical and financial progress of both projects along with total expenditure incurred till date; (c) the reasons for non-completion of said works as per schedule including land acquisition, railway approvals, utility shifting, contractor performance or administrative delays and the details of the action taken or proposed against the officers/agencies responsible for the delay; and (d) the total cost escalation caused by the delay along with the revised cost, additional financial burden and the revised deadline to complete and open both ROBs for the public?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceHelicopter Accidents in Himalayan Region
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3039 · Asked on 2026-08-06
Ministry: CIVIL AVIATION
Member asked
(a) the number of helicopter accidents reported in Himalayan States during the last three years, State-wise; (b) whether the Government has conducted any technical/safety audits of helicopter operations in high altitude, difficult terrains of the Himalayan region and if so, the details and the findings thereof; (c) the details of Standard Operating Procedures (SOPs), special flying guidelines mandated by the Director General of Civil Aviation (DGCA) for helicopter operations in these areas, including weather forecasting, terrain-mapping, pilot training, nightflying restrictions; (d) whether the Government has taken steps to upgrade helipads, communication infrastructure, real-time weather monitoring systems in Himalayan States to minimize accident risks and if so, the details thereof; (e) whether the Government proposes to introduce/mandate use of advanced safety technologies such as Terrain Awareness and Warning Systems (TAWS), Health Usage Monitoring Systems (HUMS), satellite-based navigation for helicopters flying in Himalayan region and if so, the details thereof; and (f) the measures being taken by the Government in coordination with States and Defence Forces for strengthening search and rescue in case of helicopter accidents in high-altitude regions?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceRestrictions on Purchase of Vehicles
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3040 · Asked on 2026-08-06
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) whether the Government considers the present density of vehicular traffic in the country to be excessive and warranting restrictions, if so, the details thereof; (b) the number of registered motor vehicles in metropolitan cities including Mumbai, Delhi, Kolkata and Chennai, city-wise; (c) whether the Government is considering imposing any restriction on the purchase or registration of more than 1 or 2 vehicles by a household, if so, the details thereof; and (d) whether the Government proposes to undertake any time-bound study to assess measures for controlling the increasing density of vehicular traffic in the country, if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Mandi Northern Bypass Project
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3041 · Asked on 2026-08-06
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
We have not ingested the asking members for this question.
(a) the present status of construction of the Mandi Northern Bypass project in Himachal Pradesh; (b) the total approved cost of the project, along with its physical and financial progress and the reasons for delay, if any; (c) whether the Government has assessed the expected impact of the project on decongesting Mandi town and improving connectivity to Kullu, Manali, Lahaul-Spiti and adjoining regions; (d) the measures being taken to ensure timely completion of the remaining works including tunnels, bridges and approach roads; and (e) whether the Government proposes to undertake similar bypass projects in other congestion-prone hill towns and if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceInadequate Air Connectivity from Sri Guru Ram Dass Jee International Airport
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3042 · Asked on 2026-08-06
Ministry: CIVIL AVIATION
Member asked
(a) whether the Government is aware of the severe hardships faced by passengers, particularly the large Punjabi diaspora, due to the lack of sufficient direct international flights from Sri Guru Ram Dass Jee International Airport, Amritsar, especially to Canada and if so, the details thereof; (b) whether any concrete steps are proposed to establish direct flight connectivity between Amritsar and Canada to eliminate the financial and operational inconvenience of transit travel via Delhi or foreign hubs, if so, the details thereof; (c) whether the Government has taken note of the inadequate direct domestic air connectivity from Amritsar to key strategic and religious destinations, specifically the Northeast region, Patna Sahib, Nanded Sahib, Chennai and Jaipur; (d) if so, the details of the measures being taken to introduce direct domestic flights from Amritsar to these destinations for the convenience of defence personnel stationed at the border, pilgrims, tourists, students and business travellers; and (e) the timeline by which the Government intends to enhance both international and domestic air connectivity at this major border, religious and economic hub to match its strategic importance?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceCredit Access and Support for Women Entrepreneurs in MSMEs
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3043 · Asked on 2026-08-06
Ministry: MICRO, SMALL AND MEDIUM ENTERPRISES
Member asked
Bachhav Shobha Dinesh, Praniti Shinde
(a) the details of the number of women-led Micro, Small and Medium Enterprises (MSMEs) registered, along with the sector-wise distribution during the last two years in Maharashtra; (b) the details of the total amount of formal credit disbursed to women entrepreneurs as compared to the amount of formal credit disbursed to male entrepreneurs in Maharashtra; (c) the steps taken to ensure equitable formal credit access, collateral-free loans, market linkage and mentorship for women entrepreneurs in Maharashtra; and (d) the measures taken to provide incentives specifically for women entrepreneurs from Scheduled Castes/Scheduled Tribes/Other Backward Classes (SCs/STs/OBCs) communities and lesser developed regions in Maharashtra?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceSchemes relating to Cold-chain Development
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3044 · Asked on 2026-08-06
Ministry: FOOD PROCESSING INDUSTRIES
Member asked
(a) whether the Government has reviewed the implementation of schemes relating to cold-chain development, food preservation, warehousing and integrated food parks serving in Mumbai during the last three years and if so, the details thereof; (b) the details of projects sanctioned, funds allocated and infrastructure created to improve handling, storage, transportation and processing of perishable agricultural and marine products supplied to Mumbai; (c) whether the Government has assessed the impact of these initiatives on reducing food wastage, improving farmer income and ensuring availability of quality food products in Mumbai and if so, the details thereof; and (d) the measures taken or proposed to be taken to further strengthen food supply chains, food safety standards and modern processing infrastructure serving Mumbai?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question sourceStatus of Greenfield Project
unstarredLOK SABHA · 18th Lok Sabha · Session 8 · Question no. 3045 · Asked on 2026-08-06
Ministry: ROAD TRANSPORT AND HIGHWAYS
Member asked
(a) the current status of the Greenfield project from Rajegaon in Madhya Pradesh to Raipur in Chhattisgarh; (b) whether the foundation stone of the said project has been laid; (c) whether the process of land acquisition is to be initiated for the said project; and (d) if so, the details thereof?
We have not ingested a reply for this question yet. This does not mean the government gave no reply.
Original question source